July 13, 2016, Robbie, his sister, Lynne; his brother-in-law, Stuart; and Roger, a hired lockmaster, tackled the Welland Canal. It starts in St. Katherine's, Ontario and ends in Port Colborne.
|
Entering Lock #1 |
|
Locks averaged between 45-48 ft rise. |
The owners of that sailboat just sent us photos they took of our boat, so I am revising this post to add them.
|
Stuart and Lynne |
|
Lift Bridge, it moves up and down to open and close. |
|
Locks 4, 5 and 6 took them up the height of Niagara Falls. |
|
Some of the locks were connected, out of one into another. |
|
This was in the locks with them. |
|
Three in a row. |
No comments:
Post a Comment